Return to search

Most přes Mordovu rokli / Viaduct Mordava rokle

The aim of this thesis is design of the loadbearing structure of a bridge. Out of two proposed variants was chosen prestressed girder deck of 5 spans. The bridge is built span-by-span in a formwork supported by launching girders. Calculation of load cases is made in software Midas Civil 2021 and Scia Engineer 18.1. The construction is evaluated considering the ultimate limit state and serviceability limit state. The design and evaluation were made according to valid standards.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:455425
Date January 2022
CreatorsOndřej, Václav
ContributorsRomportl, Tomáš, Nečas, Radim
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0053 seconds