Return to search

Análise econômica preliminar da implantação de incinerador de resíduos sólidos urbanos na região de Bauru

Made available in DSpace on 2014-06-11T19:25:27Z (GMT). No. of bitstreams: 0
Previous issue date: 2013-12-04Bitstream added on 2014-06-13T18:53:27Z : No. of bitstreams: 1
brito_ap_me_bauru.pdf: 812773 bytes, checksum: 4bbe78996d9465fa29a1fe1678dab01f (MD5) / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / O presente trabalho tratou de incineração dos Resíduos Sólidos Urbanos (RSU) para fins de geração de energia e como meio de dispor adequadamente dos resíduos sólidos gerados na região de Bauru. Nesse contexto propõe-se a formação de um consórcio intermunicipal como mecanismo para a criação de uma usina de incineração com sistema de cogeração de energia. Para o estudo de viabilidade econômica da implantação e instalação de Usina incineradora com sistema de aproveitamento energético, faz-se uma análise financeira baseada no Fluxo de Caixa. Para tal estudo, consideram-se as receitas provenientes do tratamento do lixo, da venda de energia elétrica dos créditos de carbono gerados. Foram realizadas simulações sobre os custos de capital para a construção e manutenção do incinerador regional, adotaram-se os seguintes métodos de análise: Valor Presente Líquido (VPL), Taxa Interna de Retorno (TIR), Payback e o Benefício/Custo. Os resultados demonstraram que a rentabilidade do projeto depende fortemente dos preços da energia elétrica práticados pelo mercado e dos preços para a disposição do lixo em aterros. Observa-se que o projeto será uma opção atraente considerando a necessidade de espaços cada vez maiores para deposição dos RSU, e que existe uma significativa tendência de que os preços para deposição em aterros sanitários tornem-se elevado. Este fato justifica o investimento no tratamento térmico, visto que o projeto contempla a disposição dos resíduos de forma sustentável tratando a gestão e manejo como uma solução aceitável ao meio ambiente / This work deals with the incineration of municipal solid waste (MSW) of energy generation purposes and as a means to dispose properly of solid waste generated in the region of Bauru, In this context was proposing the formation of an inter-municipal consorptium as a mechanism for the creation of and incineration plan with a system of co-generation of energy. For economic feasibiblity study of the implementation and installation of plant incinerator with energy recovery system, it is a financial analysis based on Cash Flow. For this study, was considering the revenue from waste treatment, the sale of electricity and carbon credits generated. Simulations were performed on the capital costs for the construction and maintenance of regional incinerator adopted the following methods of analysis. Net Present Value (NPV), Internal Rate of Return (IRR), Payback and Benefit/Cost. The results showed that the profitability of the project depends heavily on the price of eletricity charged by the market and price for waste disposal in landfills. It is observed that the projects will be and attractive option considering the need forever larger space for disposal of MSW, and that there is a significant trend that prices for disposal in landfills become high. This justifies the investments in heat treatment, since the design involves the disposal of waste in a sustainable manner by treating the management and handling an acceptable solution to the environment

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.unesp.br:11449/91722
Date04 December 2013
CreatorsBrito, Adailton Pereira de [UNESP]
ContributorsUniversidade Estadual Paulista (UNESP), Silva, Celso Luiz da [UNESP]
PublisherUniversidade Estadual Paulista (UNESP)
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguagePortuguese
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Format83 f. : il.
SourceAleph, reponame:Repositório Institucional da UNESP, instname:Universidade Estadual Paulista, instacron:UNESP
Rightsinfo:eu-repo/semantics/openAccess
Relation-1, -1

Page generated in 0.0025 seconds