The aim of this thesis is to analyze the material flow in a company located at the second stage of the supply. Material flow is monitored in terms of logistics. The focus becomes reducing production lead times due to optimized inventory. In the theoretical section briefly summarizes the nature of material flow and the means used to optimize inventory. The content of the practical part is a detailed conflict of manufacturing and non-manufacturing operations, which will be the basis for possible suggestions to improve all material flow.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:223494 |
Date | January 2012 |
Creators | Lokvencová, Veronika |
Contributors | Ing. Petr Tyráček, Ph.D., MBA, Jurová, Marie |
Publisher | Vysoké učení technické v Brně. Fakulta podnikatelská |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0016 seconds