Return to search

Timing and capacity decision on the investment of the real estate project over the finite time horizon.

Chiu, Man Kin. / Thesis (M.Phil.)--Chinese University of Hong Kong, 2008. / Includes bibliographical references (leaves 83-88). / Abstracts in English and Chinese. / Abstract --- p.i / Acknowledgement --- p.iv / Chapter 1 --- Introduction --- p.1 / Chapter 2 --- Literature Review --- p.11 / Chapter 3 --- The Model --- p.28 / Chapter 3.1 --- The Preliminaries --- p.28 / Chapter 3.2 --- The problem setting --- p.31 / Chapter 3.3 --- The optimal selling strategy and structural properties --- p.39 / Chapter 3.3.1 --- The optimal selling strategy --- p.39 / Chapter 3.4 --- The optimal investment decision-Making regarding capacity and investment time --- p.44 / Chapter 3.4.1 --- The optimal decision on the construction capacity --- p.45 / Chapter 3.4.2 --- The optimal decision on the starting time of the investment --- p.48 / Chapter 4 --- Numerical analysis --- p.55 / Chapter 4.1 --- The setting of the numerical example --- p.56 / Chapter 4.2 --- The numerical results --- p.63 / Chapter 4.2.1 --- The optimal capacity --- p.63 / Chapter 4.2.2 --- The optimal starting time of the construction --- p.69 / Chapter 4.2.3 --- The effect of the capacity constraint --- p.73 / Chapter 4.2.4 --- The effect of the time constraint --- p.78 / Chapter 5 --- Conclusion --- p.80 / Bibliography --- p.83

Identiferoai:union.ndltd.org:cuhk.edu.hk/oai:cuhk-dr:cuhk_326537
Date January 2008
ContributorsChiu, Man Kin., Chinese University of Hong Kong Graduate School. Division of Systems Engineering and Engineering Management.
Source SetsThe Chinese University of Hong Kong
LanguageEnglish, Chinese
Detected LanguageEnglish
TypeText, bibliography
Formatprint, vii, 88 leaves : ill. ; 30 cm.
RightsUse of this resource is governed by the terms and conditions of the Creative Commons “Attribution-NonCommercial-NoDerivatives 4.0 International” License (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Page generated in 0.1405 seconds