This research addresses sourcing decisions and how those decisions can affect the management of a company's assets. The study begins with a single-plant problem, in which one facility chooses, from a list of parts, which parts to bring in-house. The selection is based on maximizing the value of the selected parts, while remaining within the plant's capacity. This problem is defined as the insourcing problem and modeled as a multidimensional knapsack problem (MKP). The insourcing model is extended to address outsourcing and multiple plants. This multi-plant model, also modeled as an MKP, enables the movement of parts from one plant to another and consideration of a company-wide objective function (as opposed to a single-plant objective function as in the insourcing model).
The sourcing problem possesses characteristics that distinguish it from the standard MKP. One such characteristic is what we define as multiple attributes. To understand the multiple attribute characteristic, we compare the various dimensions in the multidimensional knapsack problem. A classification is given for an MKP as either having a single attribute (SA) or multiple attributes (MA). Mathematically, the problems of each attribute classification can be modeled in the same way with simply a different interpretation of the knapsack constraints. However, experimentation indicates that the MA-MKP is more difficult to solve than the SA-MKP. For small problems, with 100 variables and 5 constraints, the CPU time required to find the optimal solution for MA-MKP to SA-MKP problems has a ratio of 32:1.
To determine effective methods for addressing the MA-MKP, standard mixed integer programming techniques are tested. The results of this testing are that the exact approaches are not successful in dramatically reducing the solution time to the level of the SA problems. However, a simple heuristic that performs very well on the MA-MKP is presented. The heuristic utilizes variations on the benefit-to-cost ratio and strongest surrogate constraints. The results from experimentation for MA-MKP problem sets, generated using the methods for standard MKP test data sets in the literature, are presented and indicate that the heuristic performs well and improves with larger problems. The average gap between the heuristic solution and the optimal solution is 1.39% for 200-part problems and is reduced to 0.69% when the size of the problem is increased to 298 parts.
Although the MA characteristic reflects the sourcing problem, the actual data used in the eperimentation is generated with techniques presented in the literature for standard MKP test problems. Therefore, to more accurately represent the sourcing problem, industry data from a manufacturing facility is studied to identify further sourcing problem characteristics. As a result, industry-motivated data sets are generated that reflect the characteristics of industry data, yet maintain the structure of literature data sets to allow for easy comparison. It is found that both industry and industry-motivated data sets, although possessing the MA characteristic, are much easier to solve than SA problems. Indicators of difficulty appear to be the constraint tightness and a measure of the matrix sparsity. The sparsity is a significant factor because industry data tends to be very sparse, while data sets generated in the literature are completely dense. Another interesting result from the industry-motivated data sets with the single-plant problem is the tendency for a facility to prefer currently produced parts over insourcing new parts from outside the facility.
It is not uncommon for a company to have more than one facility with a particular capability. Therefore, the sourcing model is extended to include multiple facilities. With multiple-facilities, effectively all the parts are removed to form one list, and then each part is assigned to one of the facilities or outsourced externally. The multi-facility model is similar to the single-facility model with the addition of assignment constraints enforcing that each part can be assigned to only one facility. Experimentation is performed for the two-, three-, and four-facility models. The problem gets easier to solve as the number of facilities increases. With a greater number of facilities, it is likely that for each part one of facilities will dominate as the best option. Therefore, other solutions can quickly be eliminated and the problem solved more quickly. The two-facility problem is the most difficult; however, the heuristic performs well with an average gap of 0.06% between the heuristic and optimal solutions.
We conclude with a summary on experiences with modeling and solving the sourcing problem for a sheet metal fabrication facility. The model solved for this problem had over 1857 parts with 19 machines, which translates to over 70,000 variables and 38 constraints. Although extremely large compared to problems solved in the literature, this problem was solvable because of the unique structure of industry data. Our work with the facility saved the parent organization up to $4.16M per year and provided a tool that encourages a systematic and quantitative process for evaluating decisions related to sheet metal fabrication capacity. / Ph. D.
Identifer | oai:union.ndltd.org:VTETD/oai:vtechworks.lib.vt.edu:10919/29802 |
Date | 01 December 2004 |
Creators | Cherbaka, Natalie Stanislaw |
Contributors | Industrial and Systems Engineering, Meller, Russell D., Chen, Fengshan Frank, Sherali, Hanif D., Bish, Ebru K., Hoopes, Barbara J. |
Publisher | Virginia Tech |
Source Sets | Virginia Tech Theses and Dissertation |
Detected Language | English |
Type | Dissertation |
Format | application/pdf |
Rights | In Copyright, http://rightsstatements.org/vocab/InC/1.0/ |
Relation | CherbakaDissertation.pdf |
Page generated in 0.0024 seconds