Return to search

Short-term optimal operation of a hydroelectric power system

No description available.
Identiferoai:union.ndltd.org:bl.uk/oai:ethos.bl.uk:374039
Date January 1983
CreatorsAmir, B. H.
PublisherUniversity of Manchester
Source SetsEthos UK
Detected LanguageEnglish
TypeElectronic Thesis or Dissertation

Page generated in 0.0018 seconds