Return to search

Optimalizace procesu tažení drátu / Optimization of the Wire Drawing Process

The aim of work is to present and analyse assessment of the current state and at the same time the proposal of adjustments to the technology or parameters, the introduction of the wire into the drawing machine. The problem arises when the introduction of wire with a diameter of 14 mm from the material CK 67 to the drawbenches Schumag. If we introduce the wire into the drawing machines with two primary beams leads to a buckling of the wire and pack between the drawing die and the boot device. For the introduction of wire are used hydraulic boot collets, which are controlled semi-automatically. In connection with professional studies and on the basis of the calculation, simulation and practical experiment have been identified the conditions allowing the current method of deployment of wire to use.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:402526
Date January 2019
CreatorsKabilka, David
ContributorsSvětlík, Radim, Řiháček, Jan
PublisherVysoké učení technické v Brně. Fakulta strojního inženýrství
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0018 seconds