This paper describes the development of an automated production system recently completed by the Martin Marietta Aerospace Division, Orlando, Florida, for the assembly, inspection and test of printed circuit boards. The project began in January 1981 with the purpose of increasing the then existing production capability and to create the building block for the total automation of the printed circuit board assembly area of the plant in Ocala, Florida. The system was implemented using a combination of off the shelf equipment modified and integrated to create a single production system. The system employs much of the new production philosophies tailored to meet the particular needs of Martin Marietta and to fulfill present production requirements as well as future production projections. During the development and implementation of this project, flexibility within the team was required to accommodate for the unforeseen problems which surfaced. The actual work required to perform this task far exceeded the expectations of the team and the company. This document covers all facets of this project, from inception to operation, and describes the problems encountered and lessons learned throughout the project.
Identifer | oai:union.ndltd.org:ucf.edu/oai:stars.library.ucf.edu:rtd-5695 |
Date | 01 January 1984 |
Creators | Cardinal, Brian M. |
Publisher | STARS |
Source Sets | University of Central Florida |
Language | English |
Detected Language | English |
Type | text |
Format | application/pdf |
Source | Retrospective Theses and Dissertations |
Rights | Public Domain |
Page generated in 0.0023 seconds