This diploma thesis deals with the construction and technological project of the extension of the production hall Granitol a.s. in Moravian Beroun. The thesis focuses on the technological stage of assembly of the prefabricated skeleton of the rough top structure and the laying of the floor formation. In addition, an extended accompanying and summary technical report, a technical report on transport relations and coordination of oversized transport, a time and financial plan for the construction, a budget for the prefabricated skeleton, a timetable and the balance of the workers, the design of the main construction machines and mechanisms, including their time commitment , organization of the construction of the building including drawings of the construction site equipment, technological regulation for the assembly of the prefabricated skeleton and the laying of the floor formation, inspection and testing plan for the prefabricated skeleton assembly, summary assessment of the lifting mechanism selection, schematic of the assembly procedure of the prefabricated skeleton elements, protection and health at work during construction.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:392054 |
Date | January 2019 |
Creators | M©zl, Petr |
Contributors | Liška, Pavel, Novotný, Michal |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0018 seconds