Return to search

A Hindcast Comparing the Response of the Souhegan River to Dam Removal with the Simulations of the Dam Removal Express Assessment Model-1

Thesis advisor: Noah P. Snyder / Dam removal is a widely used river restoration technique. Historically, dams produced hydropower, controlled flooding, and provided water storage, but currently many dams in the United States, specifically low head dams in New England, are obsolete. This study aims to assess the ability of a simple morphodynamic sediment transport model, Dam Removal Express Assessment Model (DREAM-1), developed by Cui et al. (2006a). I compare simulations to a dam removal monitoring project that quantified the physical response of the Souhegan River to the removal of the Merrimack Village Dam (MVD), Merrimack, NH. Pearson et al. (2011) reported results of field monitoring from August 2007-May 2010 and found that the Souhegan River responded to dam removal in two phases: initial rapid incision of impoundment sediment induced by immediate base level drop of 3.9 m (~50% of impounded sediment eroded in ~2 months), followed by an event-driven phase in which impoundment sediment eroded primarily during floods. The reach downstream of the dam showed a similar two-phase response, with rapid deposition in the first three weeks after dam removal followed by bed degradation to the pre-removal elevation profile within a year. I have continued the field methods of Pearson et al. (2011) for the past two survey periods, June 2011 and July 2012. Using five years of comprehensive field data, I conduct a hindcast to compare the sediment erosion and deposition patterns predicted by DREAM-1 to the observed downstream response of the Souhegan River. I model the changes in bed elevation for the downstream and upstream channel reaches at intervals that correspond with the dates of four longitudinal profile surveys and seven annual cross-section surveys. Results of the hindcast show that DREAM-1 predicts channel elevation accurately within one meter and with average discrepancy of ±0.35 m when compared to average channel bed elevations of each cross-section. DREAM-1 successfully simulates two phases of upstream channel response, rapid impoundment erosion followed by a longer period of gradual sedimentation change. However, DREAM-1 erodes to base elevation within 11 weeks after dam removal (erosion of the 88% impoundment sand), leaving little sand for transport during the later survey periods. This overestimation of impoundment erosion is likely the product of limitations of the model, specifically the simplification of channel cross-sections with constant width throughout the simulation. The model assumes uniform lateral sediment transport in the impoundment and does not capture the variation in width due to incision and channel widening. This hinders the ability of the model to simulate some details of the sediment budget developed by Pearson et al. (2011) and extended with recent surveys. / Thesis (MS) — Boston College, 2013. / Submitted to: Boston College. Graduate School of Arts and Sciences. / Discipline: Earth and Environmental Sciences.

Identiferoai:union.ndltd.org:BOSTON/oai:dlib.bc.edu:bc-ir_101525
Date January 2013
CreatorsConlon, Maricate
PublisherBoston College
Source SetsBoston College
LanguageEnglish
Detected LanguageEnglish
TypeText, thesis
Formatelectronic, application/pdf
RightsCopyright is held by the author, with all rights reserved, unless otherwise noted.

Page generated in 0.0021 seconds