Return to search

Simulační metody a řízení rizika ve firmě / Simulation methods and risk management

Project management is a field in which risk management can be applied. There must be a business case for any project to recognize its benefits for the company. A business case generally uses point estimation of input parameters and evaluates financial criteria for individual variants such as the net present value, pay-back period or internal rate of return. A simulation enables to design a model for the business case analysis while making use of the probability distribution. The model then turns from a deterministic into a stochastic one. The Monte Carlo simulation method, calculating a large number of variants, is employed in projects. The simulation can identify major risk factors, assess their probability and the significance of the impact on the evaluated financial criterion. The analysis outputs suggested by the simulation are the fundamentals of proper risk management. The Crystal Ball simulation software was employed for the calculation in this thesis.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:81884
Date January 2010
CreatorsŠemnická, Eliška
ContributorsKuncová, Martina, Borovička, Adam
PublisherVysoká škola ekonomická v Praze
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0035 seconds