Master thesis consists of the construction of a small hydroelectric power play model for laboratory use. The first step is to calculate parameters required for the creation of the 2D model Banki turbine. Next part is a proposal and selection of individual components of the model, such as generator, turbine housing, water circuit, pump and alternator mounting. The last step is to launch the model and verify, if the model of a small hydroelectric power plant achieves the required parameters.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:221347 |
Date | January 2015 |
Creators | Urbánek, Jaroslav |
Contributors | Macháček, Jan, Radil, Lukáš |
Publisher | Vysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.002 seconds