Return to search

Plynofikace horkovodního kotle / Fuel change for hot water boiler

This thesis deals with the fuel change for hot water boilers with wattage of 116.3 MW. At first a stoichiometric calculation is drawn. Calculation of pressure loss in pipeline follows. Consequential part elaborates on calculation of parallel connected heating surfaces following with a draft of regenerative air heater Ljungtröm. Conclusively, a calculation is carried out to verify the functionality of the serial connection of the heating surfaces.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:232167
Date January 2015
CreatorsMik, Martin
ContributorsNechvátal, Ondřej, Skála, Zdeněk
PublisherVysoké učení technické v Brně. Fakulta strojního inženýrství
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0028 seconds