This thesis deals with the fuel change for hot water boilers with wattage of 116.3 MW. At first a stoichiometric calculation is drawn. Calculation of pressure loss in pipeline follows. Consequential part elaborates on calculation of parallel connected heating surfaces following with a draft of regenerative air heater Ljungtröm. Conclusively, a calculation is carried out to verify the functionality of the serial connection of the heating surfaces.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:232167 |
Date | January 2015 |
Creators | Mik, Martin |
Contributors | Nechvátal, Ondřej, Skála, Zdeněk |
Publisher | Vysoké učení technické v Brně. Fakulta strojního inženýrství |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0028 seconds