Return to search

Oprava a zesílení železobetonové stropní konstrukce / Reconstruction and strengthening of reinforced concrete ceiling construction

The final thesis deals with strengthening of cast-in-place concrete ceiling in existing construction for couple of escalators. New prestressed beam, columns in new positions and strengthened girder with unbonded strands are building in this adjustments. Every member, including the existing construction, is verified for ultimate and serviceability limit state. Prestressed members are alternatively designed with bonded strands and these variants are comparison in terms of utilization and calculation.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:227204
Date January 2015
CreatorsKlimeš, Petr
ContributorsZich, Miloš, Perla, Jan
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0017 seconds