Return to search

Přemostění přehrady / Bridging reservoir

The diploma thesis deals with the design of the supporting structure of a road bridge over a reservoir. Two variants of bridging were processed. The selected variant is a three span continuous beam. It is made of box girder cross section with a variable height. The structure has a total length of 156,8 m and is built using balanced cantilever method. The bridge is designed and assessed according to the limit states for temporary and permanent design situations. Structural analysis, drawing documentation and visualization of the bridge is part of the work.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:433117
CreatorsKučerka, Ján
ContributorsSliwka, Pavel, Koláček, Jan
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0017 seconds