Return to search

Autocorrelated data in quality control charts

Control charts are regularly developed with the assumption that the process observations have an independent relationship. However, a common occurrence in certain industries is the collection of autocorrelated data. Two approaches are investigated that deal with this issue. The time series approach is based on modeling the data with an appropriate time series model to remove the autocorrelative structure. The EWMA approach is based on modeling the observations as a weighted average of previous data. The residuals from the two approaches are plotted on control charts and the average run lengths are compared. Both methods are applied to simulations that generate in-control data and data that have strategically located nonstandard conditions. The nonstandard conditions simulated are process change, linear drift, mean shift, and variance shift. It is proposed that the time series approach tends to perform better in these situations.

Identiferoai:union.ndltd.org:RICE/oai:scholarship.rice.edu:1911/13844
Date January 1994
CreatorsHood, Terri Frantom
ContributorsEnsor, Katherine B.
Source SetsRice University
LanguageEnglish
Detected LanguageEnglish
TypeThesis, Text
Format124 p., application/pdf

Page generated in 0.0021 seconds