Submitted by Fatima Fonseca (fatima.fonseca@sibi.ufrj.br) on 2018-06-04T14:02:59Z
No. of bitstreams: 1
172826.pdf: 2322281 bytes, checksum: 94ad27fc73f449a180dd5bdf935c4a7e (MD5) / Made available in DSpace on 2018-06-04T14:02:59Z (GMT). No. of bitstreams: 1
172826.pdf: 2322281 bytes, checksum: 94ad27fc73f449a180dd5bdf935c4a7e (MD5)
Previous issue date: 1991-05 / São apresentados neste trabalho os principais dispositivos de controle de percolação pela fundação
permeável de barragens. Utilizou-se do método dos elementos finitos (MEF) para verificação dos métodos de dimensionamento de tapetes. Foram realizadas simulações via MEF, com o uso de duas barragens fictícias. Verificou-se a aproximação dos métodos de dimensionamento de tapetes quanto a vazão, gradientes, comprimento efetivo e seção transversal. Concluiu-se que a seção transversal de forma triangular
apresenta-se como a mais eficiente e mais viável economicamente. Avaliou-se também, duas formas de vales distintas. Um com alargamento a montante da barragem e outro sem o alargamento. Propôs-se então, um roteiro para projeto de tapetes a partir das conclusões obtidas nas simulações. Foi feita também, uma aplicação com dados reais de uma barragem (Barragem do Carão) sobre fundação permeável que utiliza o tapete como redutor de percolação, sendo comparados os dados reais com os de Bennett (comprimento
efetivo) e do MEF. / This work presents the principal solutions for of seepage control on pervious dam foundations. The Finite
Elements Method (FEM) was used for the verification of blanket dimensioning methods. Various simulations were undertaken via FEM with the use of two fictitious dams. The blanket dimensioning methods were verified with respect to leakage, upward gradient, efective lenght and cross section. It was conclued that the triangular cross section is the most efficient and economically viable. Two distinct valley forms were also evaluated. One
with widening at the upstream side of the dam and the other without. A blanket design method based on the results obtained in the simulation is proposed. An evaluation of a real situation was also done using data from an existing dam (the Carão dam) over a pervious foundation that uses the upstream blanket as a percolation control method. The dam data is compared with that presented by Bennett (effective lenght) and of the FEM.
Identifer | oai:union.ndltd.org:IBICT/oai:pantheon.ufrj.br:11422/4009 |
Date | 05 1900 |
Creators | Silva Filho, Francisco Chagas da |
Contributors | Miranda, Antonio Nunes de, Lopes, Francisco de Rezende, Brandt, José Roberto Thedim, Sandroni, Sandro Salvador |
Publisher | Universidade Federal do Rio de Janeiro, Programa de Pós-Graduação em Engenharia Civil, UFRJ, Brasil, Instituto Alberto Luiz Coimbra de Pós-Graduação e Pesquisa em Engenharia |
Source Sets | IBICT Brazilian ETDs |
Language | Portuguese |
Detected Language | Portuguese |
Type | info:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis |
Source | reponame:Repositório Institucional da UFRJ, instname:Universidade Federal do Rio de Janeiro, instacron:UFRJ |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.006 seconds