In most cases, data from petroleum industry wetland studies indicate that treatment wetlands are equally or more effective at removing pollutants from petroleum industry wastewaters than from other types of wastewater. In this study, we discussed the treatment efficiencies of oil-refinery industry wastewater by pilot-scale constructed wetland systems .The constructed wetland systems were one free water surface system filled with the sandy media and one subsurface flow system filled with the gravel media operated in parallel. Each system planted with Phragmites communis. The hydraulic retention time for the treatment wetland was controlled in turn at 0.96, 0.48, and 0.72 days. The experimental results showed that all of these contaminants could be reliably removed from wastewater by treatment wetland, especially the FWS. The effluents from the constructed wetland systems reusing and recovering were feasible.
Identifer | oai:union.ndltd.org:NSYSU/oai:NSYSU:etd-0718101-103346 |
Date | 18 July 2001 |
Creators | Shih, Pei-Yu |
Contributors | Weche K, Jimmy C. M. Kao, Lei Yang |
Publisher | NSYSU |
Source Sets | NSYSU Electronic Thesis and Dissertation Archive |
Language | Cholon |
Detected Language | English |
Type | text |
Format | application/pdf |
Source | http://etd.lib.nsysu.edu.tw/ETD-db/ETD-search/view_etd?URN=etd-0718101-103346 |
Rights | restricted, Copyright information available at source archive |
Page generated in 0.0046 seconds