This master thesis has been conducted at Forsmark nuclear power plant. In nuclear power plants, safety is one of the most important tasks. After the Fukushima-accident, Forsmarks Kraftgrupp AB investigated the possibility to have additional emergency cooling systems. This thesis aims to investigate the use of cooling towers as mobile emergency cooling system for decay heat removal for the nuclear reactors at Forsmark NPP. The advantages and disadvantages of different cooling tower types were looked at. To achieve mobility, some restraints were considered such as dimensions and weight. In the design of cooling towers, experimental values are used. As these crucial data are missing, a backfitting from actual designs was done to derivate the missing data. The results of this thesis show that wet cooling towers are in this case more effective than dry cooling towers. The wet cooling towers cover in the best scenario up to 38MW which is 10 times higher than what can be achieved with the dry cooling tower. That covers the maximal decay heat released in the reactor F3 12 hours after a shutdown.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:uu-400203 |
Date | January 2019 |
Creators | Hissein Koty, Habre |
Source Sets | DiVA Archive at Upsalla University |
Language | English |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Relation | UPTEC ES, 1650-8300 ; 18 032 |
Page generated in 0.0024 seconds