The thesis continues with the bachelor thesis which had dealt with preparation bases for simulation draining and carrying materials in SWAT model. Simulation should have been realized within basin of the Jenín stream, which watershed is 4,65 km2 large. SWAT model is primary developed for the larger watersheds where simulated values doesn't attain tolerances. Because of this is thesis focused on the methodic of simulation itself, discussion of the problem when is SWAT model almost useless for the small watersheds and presentation of the calibrated values which had served as basis for verification.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:174140 |
Date | January 2014 |
Creators | HOMOLKA, Jan |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.005 seconds