Return to search

Horský hotel / Mountain Hotel

The building will be situated by the village Slupečná near the Lipno dam and located on the land that slopes to the south. It’s designed as a separately standing, four-storey. The technology of implementation is a brick. The construction system is designed as a longitudinal wall system stiffened in the transverse direction inner supporting walls. The concrete breeze blocks from the company BS Klatovy are used as main building material. Basic constructions are designed as planar and out of plain concrete and reinforced concrete. Stiff reinforced concrete prefabricated and prefamonolitic ceiling constructions from the company BS Klatovy are designed. Roofing is designed with tilt roof. The bearing construction is made up of purlin system of wood truss. Height of the roof ridge, including the covering is +13.650 m (considering relative height of 0.000). The height of the chimney head is +14.400 m. Profiled metal roof covering Lindab Goodlock is designed.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:226182
Date January 2013
CreatorsSkala, Zdeněk
ContributorsManová, Ludmila, Maceková, Věra
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0018 seconds