Žabovřesky Kominsky PARK TRUE PLACE: flood plain regulations shackled the river bed and the modern road odřezávající entire area from the surrounding severed the network of historic paths and create new relationships without deeper flooding as a regular fact immediate presence of water in the heavily built-up structure of CONCEPT: grab territory as a whole, intended for sports and relaxation activities respect for the flood in some initial layout surface structure determination of the primary network of roads, copying the edge PCB Layout definition of a strip along the highway, allowing the possible development of communication, service roads parallel to the parking lot, bike path and pedestrian traffic determination can be built-up edge on the edge of the strip network of secondary roads in the area as a walking trail winding along the river in the surface structure after a strict cross-linking the main line route green park adherence to the river with a gradual blending in the edges of the main roads possible space-based courses to přímkám routes linking the main routes vistas passing across the territory with a focus on the strongest dominating the valley SOCCER ACADEMY CONCEPT: location of the site into a suitable strip of water above the fifty maximum possible use of built-up edge house as a barrier against noise from the highway ARCHITECTURE: mass divided module, based on the minimum space requirements for the use of distribution of land mass divided into courses and by major thoroughfares possible mass in vista halls and places of employment corridor linking the northern and southern roofed facade Covered seating along the main matter - pier stands without roof DISPOSITION: above the water level importance of the courses, the content of the section object two blocks and changing rooms opposite the training pitches with artificial grass block administration, coaches, referees, specifying the main playground free playground area fill the background of coffee the block defined on the one hand, a closed area facilities - on the other hand, open cafe CONSTRUCTION: reinforced concrete walls based on micropiles ribbed ceiling with laminated wooden truss perimeter glazing insulating glass pier made of wooden beams based on the transverse steel balls SEASONAL CLOAKROOM CONCEPT: man as a regular item in the landscape minimum space requirements, minimum maintenance, maximum durability ARCHITECTURE: block with the cor-tenových sheets with holes burned center cabinets with stainless steel plate zohýbaného polished concrete floor screed CONSTRUCTION PROCESS: in the internal space spot welding cor-Tenova quarto fitting doors welding roof work installation of ballast instead of bringing water and waste dosypání circuit and concreting the interior of the building installation of prefab blocks of stainless steel cabinets
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:215776 |
Date | January 2011 |
Creators | Deržmíšek, Pavel |
Contributors | Rudiš, Viktor, Koleček, Ivan |
Publisher | Vysoké učení technické v Brně. Fakulta architektury |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0023 seconds