Return to search

Modely toků v síti pro odpadové hospodářství / Network flow models for waste management

This thesis is devoted to the construction of new waste-to-energy plants in a territory where is already another fossil-fuel power station in operation. The aim is to create a mathematical model and prove that those two devices are able to cooperate effectively using same technology. Exactly assembled model under real operating have characteristics of a mixed integer nonlinear programming. The optimization software GAMS is used for its calculation. The complexity of the model, however, is at a level that solutions in bad initial conditions ends in local optima, or not found at all. This thesis is devoted to the elimination of non-linearity using binary variables and heuristic so the task was solved with acceptable time limits to guarantee an optimal solution.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:254439
Date January 2016
CreatorsJanošťák, František
ContributorsMrázková, Eva, Pavlas, Martin
PublisherVysoké učení technické v Brně. Fakulta strojního inženýrství
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0024 seconds