Return to search

Simulation of Hydro Power Expansion in Skellefteälven

The aim with this project is to examine how an expansion of the Swedish hydro power capacity in Skellefte¨alven, a river in Northern Sweden, could benefit the power system such that bottlenecks are eliminated. The project also examines how a future need for additional power can be met. The results support an expansion of hydro power, partly to meet an increased power demand and partly to eliminate bottlenecks which would promote an optimal run. The report does not contain any economical aspects that would occur in an expansion. This project is a part of a project from North European Energy Perspective project, www.nepp.se. / Målet med projektet är att undersöka vinster vid en eventuell utbyggnad av vattenkraftverken i Skellefteälven på sådant sätt att flaskhalsar elimineras. I arbetet analyseras även hur ett framtida ökat effektbehov kan bemötas. Resultaten visar ett stöd för en utbyggnad av vattenkraftverk, dels för att kunna möta ett ökat effektbehov och dels för att eliminerade flaskhalsar främjar en optimal körning. Rapporten innehåller inte de ekonomiska aspekter som skulle uppkomma vid en utbyggnad. Detta är en del av ett större projekt inom North European Energy Perspective, www.nepp.se.

Identiferoai:union.ndltd.org:UPSALLA1/oai:DiVA.org:kth-229972
Date January 2018
CreatorsSag, Jan Jack
PublisherKTH, Optimeringslära och systemteori
Source SetsDiVA Archive at Upsalla University
LanguageEnglish
Detected LanguageSwedish
TypeStudent thesis, info:eu-repo/semantics/bachelorThesis, text
Formatapplication/pdf
Rightsinfo:eu-repo/semantics/openAccess
RelationTRITA-CBH-GRU ; 2018:261

Page generated in 0.0018 seconds