The final thesis is focused on design a bridge construction. across the valley near Dobruška. The existing bridge is convenient and it will be replaced by a new bridge construction. The bridge is situated on motorway I/14 and it is used to transfer across the valley and Brtevsky brook.The bridge construction is designed in three alternatives. The chosen variant is a post-tensioned two-beam concrete construction with a lenght of 88,5 metres and a width of 14,0 metres. The calculation of load is solved in Scia Engineer 2014. The construction is designed in accordance with valid standards and it is made a drawing documentation.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:227736 |
Date | January 2015 |
Creators | Dočkal, Miloš |
Contributors | Krejčík, Vladimír, Klusáček, Ladislav |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0015 seconds