Return to search

Planejamento e controle na constru??o civil de parques e?licos: proposta explorat?ria de uma abordagem h?brida de gerenciamento de projetos

Submitted by Automa??o e Estat?stica (sst@bczm.ufrn.br) on 2017-02-13T19:28:10Z
No. of bitstreams: 1
PedroBaesseAlvesPereira_DISSERT.pdf: 1699674 bytes, checksum: f6af93574e41ad6736f18ad1e075daae (MD5) / Approved for entry into archive by Arlan Eloi Leite Silva (eloihistoriador@yahoo.com.br) on 2017-02-14T18:35:46Z (GMT) No. of bitstreams: 1
PedroBaesseAlvesPereira_DISSERT.pdf: 1699674 bytes, checksum: f6af93574e41ad6736f18ad1e075daae (MD5) / Made available in DSpace on 2017-02-14T18:35:46Z (GMT). No. of bitstreams: 1
PedroBaesseAlvesPereira_DISSERT.pdf: 1699674 bytes, checksum: f6af93574e41ad6736f18ad1e075daae (MD5)
Previous issue date: 2016-07-29 / O fornecimento de energia el?trica tem sido considerado um aspecto cr?tico da vida moderna,
atuando como papel central no cen?rio econ?mico da maioria dos pa?ses. Com a preocupa??o
ambiental, econ?mica e a evolu??o tecnol?gica, a energia e?lica se tornou uma op??o vi?vel de
fonte alternativa de energia el?trica. Para a obten??o desse tipo de gera??o el?trica ? necess?ria a
constru??o de parques e?licos, que s?o projetos de alta complexidade. Com o intuito de ajudar no
processo de edifica??o civil desse tipo de empreendimento, esta pesquisa prop?e um modelo
h?brido de planejamento e controle de gerenciamento de projetos para auxiliar a constru??o civil
de parques e?licos. A primeira parte da pesquisa foi constitu?da de uma investiga??o de campo
preliminar e de estudo da literatura sobre gerenciamento de projetos, energia e?lica e constru??o
de parques e?licos. Na segunda etapa, um estudo de caso de constru??o de parque e?lico foi
feito, considerado a refer?ncia de constru??o civil para o melhor entendimento do seu processo e
de como o gerenciamento de projetos foi usado. Assim, foi proposto um modelo h?brido de
planejamento e controle da constru??o civil de parques e?licos que aprimoram a execu??o de
projetos, aperfei?oando ?ndices de car?ter financeiro, de satisfa??o do cliente e de compet?ncia
em projetos. / The supply of electricity has been considered a critical aspect of the modern life, working as a
central role in the economic situation of most countries. The environmental, economic concerns
and the technological evolution allowed the consolidation of wind energy as a viable alternative
energy source. To produce this type of electricity generation is required the construction of wind
farms, which are high complexity projects. This research aims to propose a hybrid management
project model of planning and controlling to assist the construction of wind farms by helping the
process of building this sort of constructions. The first part of research was a preliminary field
investigation and literature study on project management, wind power and construction of wind
farms. During the second phase, the case study was performed about the construction of a wind
farm, that is considered a reference in civil construction to better understand its process and how
the project management was used. With this information, the planning and controlling hybrid
model for construction of wind farms was proposed. It aims the improvement of wind projects
edification resulting in better financial, customer satisfaction and skill projects aspects.

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.ufrn.br:123456789/21978
Date29 July 2016
CreatorsPereira, Pedro Baesse Alves
Contributors01434445496, Costa, Jos? Alfredo Ferreira, 53820126449, Ara?jo, Renato Samuel Barbosa de, 48180068404, Gonzalez, Mario Orestes Aguirre
PublisherPROGRAMA DE P?S-GRADUA??O EM ENGENHARIA DE PRODU??O, UFRN, Brasil
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Sourcereponame:Repositório Institucional da UFRN, instname:Universidade Federal do Rio Grande do Norte, instacron:UFRN
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0021 seconds