Return to search

Construção fragmentada: uma análise gerencial dos processos construtivos do complexo de prédios do Instituto de Educação Matemática e Científica (IEMCI) da UFPA

Submitted by Edisangela Bastos (edisangela@ufpa.br) on 2013-02-28T21:24:09Z
No. of bitstreams: 2
license_rdf: 23898 bytes, checksum: e363e809996cf46ada20da1accfcd9c7 (MD5)
Dissertacao_ConstrucaoFragmentadaAnalise.pdf: 1827569 bytes, checksum: 24e9507c8a36a0368f55c4bc8d072f81 (MD5) / Approved for entry into archive by Ana Rosa Silva(arosa@ufpa.br) on 2013-03-05T12:09:58Z (GMT) No. of bitstreams: 2
license_rdf: 23898 bytes, checksum: e363e809996cf46ada20da1accfcd9c7 (MD5)
Dissertacao_ConstrucaoFragmentadaAnalise.pdf: 1827569 bytes, checksum: 24e9507c8a36a0368f55c4bc8d072f81 (MD5) / Made available in DSpace on 2013-03-05T12:09:58Z (GMT). No. of bitstreams: 2
license_rdf: 23898 bytes, checksum: e363e809996cf46ada20da1accfcd9c7 (MD5)
Dissertacao_ConstrucaoFragmentadaAnalise.pdf: 1827569 bytes, checksum: 24e9507c8a36a0368f55c4bc8d072f81 (MD5)
Previous issue date: 2013 / Nos últimos anos, a Universidade Federal do Pará (UFPA), entre outras providências importantes, tem investido significativamente na reestruturação e expansão de seus campi, com a construção de novos prédios, ampliação e reforma dos já existentes. Como na maioria das IFES, porém, na UFPA não existe estrutura e tempo suficientes para que a equipe técnica responsável possa gerenciar e executar os projetos executivos, acompanhar e fiscalizar as obras de construção e manutenção. O objetivo deste trabalho é fazer uma análise gerencial dos processos construtivos da UFPA, tomando por base a obra do Complexo de prédios do Instituto de Educação Matemática e Científica (IEMCI) da UFPA, visando à identificação e minimização dos problemas que se apresentaram ao longo de seu fluxo. Para tal, procedeu-se um estudo de caso nos processos administrativos e demais documentos inerentes à construção dos diversos módulos que compõem o Instituto, com o levantamento de dados de todas as obras executadas, e realização de entrevistas, baseadas no modelo de Campos (2011), a todos os envolvidos no processo. Após a análise dos resultados, constatou-se que a falta de planejamento e gerenciamento efetivo dos processos de projeto construtivos produziram vários problemas, entre os quais, projetos incompletos e falhos, levando à construção fragmentada. A obra, executada em várias etapas, custou 35,19% mais, do que se fosse realizada em uma só etapa, integralmente. Quanto ao prazo, esse acréscimo foi maior ainda, chegando a 283%. Concluindo-se que os intervenientes causados pela fragmentação, influenciaram seriamente no prazo e no valor final da obra. / In recent years the Federal University of Pará (UFPA), among other important precautions, has invested significantly in the restructuring and expansion of its campi, the construction of new buildings, expansion and renovation of the existing ones. As in most IFES, however, the UFPA has no structure or enough time for the responsible technical crew to manage and develop constructive project execution, monitor and supervise the construction works and maintenance. The objective of this study is to make a management analyze of the construction processes at the UFPA, on the basis of the complex of buildings of the Institute of Mathematics and Science Education (IEMCI), aiming the identification and minimization of the problems presented along its flow. To do so, through a case study of the administrative procedures and other documents related to the construction of the various modules that make up the Institute, with the data collection of all the performed works, and conducting interviews, based on the Campos's model (2011), to everyone involved in the process. After analyzing the results, the conclusion was that a lack of planning and effective management of constructive processes produced several problems, among them, incomplete and flawed projects, leading to fragmented construction. The construction executed through stages cost 35.19% more than if it was performed in one step and in its entirety. And as the term, this increase was even greater, reaching 283%. Concluding that the interveners caused by fragmentation, seriously influenced on the deadline and the final cost of the construction.

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.ufpa.br:2011/3516
Date22 January 2013
CreatorsBORDALO, Rosa Helena Coutinho
ContributorsLIMA, Adalberto da Cruz
PublisherUniversidade Federal do Pará, Programa de Pós-Graduação em Engenharia Civil, UFPA, Brasil, Instituto de Tecnologia
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Sourcereponame:Repositório Institucional da UFPA, instname:Universidade Federal do Pará, instacron:UFPA
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0029 seconds