Return to search

Vicepolový deskotrámový most / Multi-span double teebridge

Main purpose of the diploma thesis is to design a multi-span double-girder bridge which spans the valley of a river. The bridge spans main road of 1st class. Main superstructure of a bridge is made of prestressed concrete which is built span by span. Structure was designed according to limit states in construction stages as well as during the service. Everything was designed according to the latest European normatives. It contains static calculation and drawing documentation.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:455407
Date January 2022
CreatorsAlušic, Michal
ContributorsŘeřucha, Kamil, Koláček, Jan
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageSlovak
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0017 seconds