Determination of contingency for international projects plays an important role for inclusion of risks taken by the contractor on the bid amount. Although determination of contingency is an important stage of bid preparation for international projects, the methods that are being used by Turkish contractors for quantification of contingency are very limited. In this thesis the factors affecting the contingency decisions of Turkish contractors for international projects will be investigated. The significance of these factors will be determined and a model determining the contingency will be developed.
Identifer | oai:union.ndltd.org:METU/oai:etd.lib.metu.edu.tr:http://etd.lib.metu.edu.tr/upload/12606334/index.pdf |
Date | 01 July 2005 |
Creators | Ergin, Abdullah Arif |
Contributors | Sonmez, Rifat |
Publisher | METU |
Source Sets | Middle East Technical Univ. |
Language | English |
Detected Language | English |
Type | M.S. Thesis |
Format | text/pdf |
Rights | To liberate the content for public access |
Page generated in 0.0021 seconds