Although the client's objectives of balancing cost, time and performance have not changed, the complexity of the design and construction of modern buildings today requires a thorough understanding of the factors affecting these objectives if they are to be accomplished. This study therefore begins by analysing the client's objectives to establish the factors affecting each objective and to determine the inter-relationship and possible conflict between these factors. The principal types of contracts and methods of selecting a contractor are then identified. The methods of selecting a contractor are then evaluated according to these factors and their effects on the client's objectives are established. This evaluation is then used as the basis for recommending a procedure to choose which method should be used to select a contractor, in order to accomplish the client's objectives, under differing circumstances.
Identifer | oai:union.ndltd.org:netd.ac.za/oai:union.ndltd.org:uct/oai:localhost:11427/28247 |
Date | January 1986 |
Creators | Stevenson, Colin |
Contributors | Butt, P E |
Publisher | University of Cape Town, Faculty of Engineering and the Built Environment, Department of Construction Economics and Management |
Source Sets | South African National ETD Portal |
Language | English |
Detected Language | English |
Type | Bachelor Thesis, Honours, BSc (Hons) |
Format | application/pdf |
Page generated in 0.0103 seconds