The primary purpose of this study was to analyze the capability and inclination of the aerospace and electronics industry contractors to abide by the general provisions of the Cost/Schedule Control Systems Criteria (C/SCSC).
Identifer | oai:union.ndltd.org:unt.edu/info:ark/67531/metadc277777 |
Date | 08 1900 |
Creators | Richardson, Gary Lowell |
Contributors | Hays, Henry, Maher, Laurence P., Griffith, Reynolds, Melton, R. B. (Rosser B.) |
Publisher | North Texas State University |
Source Sets | University of North Texas |
Language | English |
Detected Language | English |
Type | Thesis or Dissertation |
Format | xi, 357 leaves : ill., Text |
Rights | Public, Copyright, Copyright is held by the author, unless otherwise noted. All rights reserved., Richardson, Gary Lowell |
Page generated in 0.0017 seconds