Return to search

Návrh zefektivnění přípravy výroby u vybrané technologie / The Study of More Effectiveness Preparation of Production Process by Selected Technology

The aim of this thesis is shortening of standard mechanical time of work piece from aluminium casting alloy. . The shortening can be reached by linear programming of cutting conditions of cutting conditions during machining holes. This method is defined both theoretically and is applied to given setting and by the calculation by the Simplex method. Another method is exchange of tools at machined threads, it’s exchange of used tools for the new one, that makes more operations at a time. The result is shortening of mechanical time, augmentation of productive dose, capacities of workplace and productivity work.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:228170
Date January 2008
CreatorsŠalanda, Jiří
ContributorsVodrážka, Stanislav, Jurová, Marie
PublisherVysoké učení technické v Brně. Fakulta strojního inženýrství
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0701 seconds