In this study, the first hardfill dam in Turkey, Cindere Dam, is evaluated
regarding current and alternative measurement systems in detail. Cindere
Dam is a notable project, especially with its height as an example of hardfill
dam, not only in Turkey but also in the world. First, the current
instrumentation system of Cindere Dam is evaluated as a whole with
reference to the parameters measured, instruments and data acquisition
system. Second, an alternative instrumentation system is developed by
using additional parameter and instruments to the current instrumentation
system. Furthermore, each instrumentation system equipped with manual
and automatic data acquisition systems is considered. The comparison
between the current and the alternative instrumentation systems are also
carried out in terms of technical and economical feasibility aspects.
Although, the current instrumentation system is found to be satisfactory, it
is observed that the alternative system promotes the current system in
various aspects without increasing the cost significantly.
Identifer | oai:union.ndltd.org:METU/oai:etd.lib.metu.edu.tr:http://etd.lib.metu.edu.tr/upload/3/12609812/index.pdf |
Date | 01 August 2008 |
Creators | Sezgin, Ozgun Ilke |
Contributors | Yanmaz, A. Melih |
Publisher | METU |
Source Sets | Middle East Technical Univ. |
Language | English |
Detected Language | English |
Type | M.S. Thesis |
Format | text/pdf |
Rights | To liberate the content for public access |
Page generated in 0.002 seconds