Return to search

Projekt přípravy a realizace výrobní a skladovací haly v Mniší / Execution of Production and Storage Hall in Mniší

The diploma thesis deals with the realization of a production and storage hall for the engineering industry. Part of the realization of the production hall is the demolition work of the existing agricultural building. The reconstruction of the existing premises of locksmith's workshop and dressing room for employees is also being implemented. For the preparation of this project, the thesis deals with the implementation of the main technological stages, technological plans for demolition work and substructure, transport routes of the main building materials and machines, technical report of the building site, time and financial plan of the construction, security measures especially for demolition works, quality control when drilling a pilot.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:372026
Date January 2018
CreatorsŠilhová, Kristýna
ContributorsLiška, Pavel, Nečasová, Barbora
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0023 seconds