Return to search

BEMS-assisted Commissioning of HVAC System Energy Conservation Designs

In recent years, Green Building Promotion program has made a significant progress where 1359 cases have acquired the Green Building Candidate Certificate. Among them, 245 cases or 18% in total, eventually received the Green Building Label which is considered low and need to be improved.
On the other hand, in United States where LEED is applied, the Commissioning, abbreviated as Commissioning, has been deemed as a Pre-Requisite Requirement for all LEED Projects. In ASHRAE design guides, Commissioning has been defined as a procedure through testing, adjusting, and balancing, to Perform in Conformity with the Design Intent.
The goals of Owners, designers, and engineering contractors can all be integrated and optimized where design intent can be fulfilled with traceable records during the Commissioning process.
Though Testing, Adjusting, Balancing, and Commissioning, building energy efficiency can be upgraded where energy savings and CO2 emission reduction can be obtained.

Identiferoai:union.ndltd.org:NSYSU/oai:NSYSU:etd-0720108-234846
Date20 July 2008
CreatorsChen, Lin-Hung
PublisherNSYSU
Source SetsNSYSU Electronic Thesis and Dissertation Archive
LanguageCholon
Detected LanguageEnglish
Typetext
Formatapplication/pdf
Sourcehttp://etd.lib.nsysu.edu.tw/ETD-db/ETD-search/view_etd?URN=etd-0720108-234846
Rightswithheld, Copyright information available at source archive

Page generated in 0.003 seconds