The aim of the thesis is to describe the situation in transformation 110/22 kV in distribution area E.ON East. Next to describe the current practice in the replacement of 110/22 kV transformers and mention the possibilities of replacing the machines at the end of their lifecycle with respect to the development of the load of the individual transformer stations in the distribution area. An integral part of the thesis is also the economic evaluation of premature replacement of transformers from two different perspectives. The next point is to look at the current possibilities in the lifecycle lengthening of these devices and to suggest a method for monitoring the state of paper insulation to estimate the remaining lifetime of the transformer. The last point is the evaluation of the transition of a significant customer from a voltage level of 22 kV to a voltage level of 110 kV, including related technical and economic issues.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:316799 |
Date | January 2017 |
Creators | Suk, Jiří |
Contributors | Radil, Lukáš, Krbal, Michal |
Publisher | Vysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0018 seconds