Return to search

Plan de gestión integral para reducir daños ocasionados por huaicos, quebrada El Pedregal, Chosica / Integrated Management Plan to reduce damage caused by debris flow, El Pedregal creek, Chosica

La quebrada El Pedregal viene siendo afectada por la generación de flujo de escombros o huaicos que ocasionan pérdida de vida, daños a la infraestructura, a la salud y medioambientales. En 1987 un huaico provocó aproximadamente 100 fallecidos y 1000 viviendas fueron destruidas (Abad, 2009). Los huaicos son originados por las fuertes y/o constantes precipitaciones, el Fenómeno del Niño y condiciones naturales desfavorables de pendiente, geología, drenaje y forma de la subcuenca. Adicionalmente, el establecimiento de población en zonas de riesgo, el déficit de las medidas de prevención y mitigación e inadecuada planificación ante la ocurrencia de huaicos reflejan la vulnerabilidad existente, lo que generan el problema principal que es el alto riesgo que hay en la quebrada El Pedregal por ocurrencia de huaicos.



Ante esta problemática, el objetivo general de la presente tesis es formular un plan de gestión integral de riesgo de desastre conformado por medidas de corrección y prevención tanto estructurales como no estructurales, para contribuir a la reducción de daños ocasionados por los huaicos. Para lo cual, se estudió el marco teórico, se recolectó y/o procesó información hidrológica, topográfica, geológica, geomorfológica, geotécnica, climatológica, e información de la ocurrencia de huaicos extraordinarios para el estudio básico de la quebrada. Se analizó la eficacia de medidas estructurales existentes como diques de mampostearía, dique de concreto ciclópeo y barreras dinámicas; y medidas no estructurales como la delimitación de la faja marginal y el sistema de alerta temprana piloto, siendo estas acciones aisladas no conformantes de un plan. Puesto que, no es posible actuar sobre el peligro natural se actúa sobre la vulnerabilidad, revirtiendo o mitigando las causas que la genera y de esta manera reducir el alto riesgo de la zona.



En base a este diagnóstico se formuló y evaluó alternativas de medidas de corrección y prevención, para seleccionar y proponer las más adecuadas que conformen el plan. Es así como se realizó un análisis comparativo de cuatro medidas estructurales como la barrera dinámica, el dique de mampostería, el dique de concreto ciclópeo y la presa SABO, como alternativas de solución para revertir el déficit de las medidas de prevención y mitigación. Se seleccionó la barrera dinámica como la estructura más eficiente debido a sus características de funcionamiento, construcción, su capacidad de retención y su menor costo por cada m³ de volumen de material de huaico retenido. Asimismo , se estimó el volumen de producción y retención para un futuro huaico y comprobado el predimensionamiento y la estabilidad de las barreras en el software DEBFLOW, se propone como medida estructural de prevención la implementación de dos nuevas barreras dinámicas Nº05 y Nº06. Además se propone como otra medida estructural de prevención la incorporación de sensores de alerta temprana en la barrera dinámica N°03 y N°06. Sobre las medidas de prevención no estructurales para revertir la inadecuada planificación ante la ocurrencia de huaicos se proponen las capacitaciones periódicas de resiliencia, de seguridad y salud, con la intención de preparar a la población para una respuesta más efectiva ante eventos de huaicos y el fortalecimiento de la institucionalidad local y cofinanciamiento para el plan. Respecto a la ocupación del territorio por parte de la población para establecer sus viviendas en zonas de riesgo, se propone como medida no estructural de corrección el desarrollo de charlas de sensibilización y concientización sobre la preservación y cuidado de la faja marginal. Estas medidas se establecieron en el plan de gestión integral que, a su vez, está estructurado por los subplanes de acciones de prevención, de emergencia, de recuperación y rehabilitación y de monitoreo. Esta propuesta engloba la gestión integral y la gestión de riesgo de desastres, que busca la integración, articulación y coordinación de las acciones, recursos y participantes con la finalidad de contribuir a la reducción del riesgo, esperando reducir las pérdidas de vidas (de 100 a 0 fallecidos), daños a la infraestructura (de 1000 a 0 viviendas dañadas) y entre otros daños sociales, económicos y ambientales.



La validación para determinar la viabilidad y fiabilidad para la implementación del Plan de Gestión Integral se desarrolló a través del método de juicio de expertos. Asimismo, se realizó una evaluación económica para verificar la viabilidad y factibilidad de la inversión del Plan de Gestión Integral. Y finalmente se realiza la validación del contenido del plan mediante el uso de herramientas modernas de ingeniería que incluyen, entre otras, las experiencias de entidades especialistas que cuentan con leyes, reglamentos, guías técnicas y planes estratégicos a nivel macro. / El Pedregal Creek has been affected by the generation of debris flow that causes loss of life, damage to infrastructure, health and environment. In 1987, one of the most catastrophic landslide in the area appeared, with approximately 100 deaths and 1000 destroyed homes (Abad, 2009). Debris flow are caused by heavy and/or constant rainfall, the El Niño phenomenon and unfavorable natural conditions of slope, geology, drainage and shape of the sub-basin. In addition, the establishment of settlements in risk areas, the deficit of adequate prevention and mitigation measures and uncoordinated and uncertain planning for the occurrence of debris flow, reflect the existing vulnerability, which generates the main problem that is the high risk that exist in El Pedregal Creek.



Faced with this problem, the general objective of this thesis is to formulate an integral management plan for disaster risk, made up of structural and non-structural correction and prevention measures, in order to contribute to the reduction of damages caused by debris flow. For this reason, the theoretical framework was studied, hydrological, topographical, geological, geomorphological, geotechnical and climatological information was collected and/or process, as well as a historical series of the occurrence of extraordinary floods the basic study of the stream. The effectiveness of existing structural measures such as masonry dikes, cyclopean concrete dikes and dynamic barriers was analyzed; and non-structural measures such as the delimitation of the marginal strip and the pilot early warning system, being these isolated actions not part of a plan. Since it is not possible to act on the natural danger, vulnerability will be carried out, reversing or mitigating the causes that generate it and in this way efforts will be made to reduce the high risk of the area.



On the basis of this diagnosis, alternatives to correction and prevention measures were formulated and evaluated, to select and propose the most appropriate ones to make up the plan. This is how a comparative analysis of four structural measures was carried out, the dynamic barrier, the masonry dyke, the cyclopean concrete dyke and Sabo dam, as solution alternatives to revert the deficit of prevention and mitigation measures. The dynamic barrier was selected as the most efficient structure due to its performance characteristics, construction, its retention capacity and its lower cost per m³ of volume of retained leached material. Likewise, the production and retention volume was estimated for a future shaft and the pre-dimensioning and stability of the barriers in the DEBFLOW software was verified. The implementation of two new dynamic barriers, No. 05 and No. 06, was proposed as a structural prevention measure. In addition, it is proposed as another structural prevention measure the incorporation of early warning sensors in the dynamic barrier N°03 and N°06. Regarding the non-structural prevention measures to reverse the inadequate planning for the occurrence of debris flow, periodic training on resilience, safety and health is proposed, with the intention of preparing the population for a more effective response to debris flow events and the strengthening of local institutions and co-financing for the plan. Regarding the occupation of the territory by the population to establish their homes in risk areas, it is proposed as a non-structural measure of correction the development of talks of sensitization and awareness about the preservation and care of the marginal strip. These measures were established in the integral management plan which, in turn, is structured by the sub-plans of prevention, emergency, recovery and rehabilitation actions and monitoring. This proposal encompasses integrated management and disaster risk management, which seeks the integration, articulation and coordination of actions, resources and participants in order to contribute to risk reduction, hoping to reduce loss of life (from 100 to 0 deaths), damage to infrastructure (from 1000 to 0 damaged homes) and among other social, economic and environmental damage.

The validation to determine the viability and reliability for the implementation of the Integral Management Plan was developed through the expert judgment method. Likewise, an economic evaluation was carried out to verify the viability and feasibility of the investment of the Integral Management Plan. And finally, the validation of the content of the plan is carried out through the use of modern engineering tools that include, among others, the experiences of specialized entities that have laws, regulations, technical guides and strategic plans at the macro level. / Tesis

Identiferoai:union.ndltd.org:PERUUPC/oai:repositorioacademico.upc.edu.pe:10757/654022
Date10 December 2020
CreatorsDelgado Ascarza, Carol Janet, Tamayo Lopez, Guiliana Andrea
ContributorsSilva Dávila, Marisa Rosana
PublisherUniversidad Peruana de Ciencias Aplicadas (UPC), PE
Source SetsUniversidad Peruana de Ciencias Aplicadas (UPC)
LanguageSpanish
Detected LanguageSpanish
Typeinfo:eu-repo/semantics/bachelorThesis
Formatapplication/pdf, application/epub, application/msword
SourceUniversidad Peruana de Ciencias Aplicadas (UPC), Repositorio Académico - UPC
Rightsinfo:eu-repo/semantics/openAccess, Attribution-NonCommercial-ShareAlike 4.0 International, http://creativecommons.org/licenses/by-nc-sa/4.0/

Page generated in 0.0036 seconds