Return to search

Engineering Study on the Dock Construction of Tungsha Island

Abstract
Case study on the dock construction of Tungsha Island has been performed in the thesis. Evaluation of the optional location as well as the dock style was first studied according to the cost and the convenience to approach. The construction process and the environmental impact to the coastal line stability and marine ecology are also evaluated.

Identiferoai:union.ndltd.org:NSYSU/oai:NSYSU:etd-0210111-193659
Date10 February 2011
CreatorsLin, Cheng-ming
ContributorsTseng, I-Fan, Chiu, Yung-Fang, Lee, Chung-Pan, Chen, Yang-Yih
PublisherNSYSU
Source SetsNSYSU Electronic Thesis and Dissertation Archive
LanguageCholon
Detected LanguageEnglish
Typetext
Formatapplication/pdf
Sourcehttp://etd.lib.nsysu.edu.tw/ETD-db/ETD-search/view_etd?URN=etd-0210111-193659
Rightsnot_available, Copyright information available at source archive

Page generated in 0.002 seconds