Return to search

Parní turbína pro fosilní elektrárnu - ST NT díl / Steam Turbine for fossil power plant - MP LP casing

This thesis describes the design of a condensing steam turbine with reheating for fossil power plant. The turbine is a double parts. The first casing is formed by a simple HP casing. The second casing is combined MP-LP casing with axial outlet of steam into the water-cooled condenser. Feedwater regeneration system consists of two high-pressure heaters, the four low-pressure heaters and feed tank. In thesis is includes the calculation of heat balance and the draft of flow channel of HP and MP-LP casing. Next is a detailed calculation of MP-LP casing with includes calculation of flowing part, selection of blade´s profiles and its stress control. Rotor MP-LP casing is checked for torsion and computed size of the critical speed. Clutch is ispected by security check and draft radial bearings. Stress control casing is carried out according to the theory of thick shells. Work includes flow scheme for 100% and 75% performance. In the end is comparing the efficiency of the individual casing of the turbine with the work 3b together with the specific heat consumption. Work includes a longitudinal section of the MP-LP casing. This thesis has been developed in cooperation Škoda Power, Doosan.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:231808
Date January 2015
CreatorsTřináctý, Jan
ContributorsWeber, Norbert, Fiedler, Jan
PublisherVysoké učení technické v Brně. Fakulta strojního inženýrství
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0016 seconds