Return to search

Porovnání ceny rozestavěné stavby RD v různých fázích výstavby s cenou provedených stavebních prací / Comparison of unfinished house prices in several stages of construction with the cost of finished construction works

The aim of this thesis is compare the price unfinished house in various stages of construction with the cost of executed construction. The price unfinished house was identified by various calculation. The various calculation were compared each other. The chosen methods are develop construction budget, determine prices through technical-economic indicators and of price regulations. Price unfinished buildings and the value of construction works is determined in three separate phases, these phases are described in the thesis itself. Calculation results are processed in graphic form and at the end of this thesis are compared with each other. Assigned task is achieved by a complete itemized budget for a house with no exterior modifications and connections. From final itemized budget are created sub-budget containing structure according to specified stages of construction. In the same stages of construction are made calculations by price indicators and price regulations. Target set in the thesis is filled at the end, all the values are described and compared. The results suggest the use of computational methods is determined by the purpose for which prices are measured. Labor and accuracy while itemized budget is confirmed, the remaining calculations are mainly informative and preliminary pricing satisfactory. The benefit of the work is to verify the use of computational methods for the different phases of the construction process.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:241325
Date January 2016
CreatorsHanzlíček, Michael
ContributorsCupal, Martin, Kosová, Jaroslava
PublisherVysoké učení technické v Brně. Ústav soudního inženýrství
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0015 seconds