The aim of the work was the usage of the Building Information Modelling system to ensure the complete building-up, including the working part of the line constructions. In the first part of my thesis I was dealing with the costs of the total life of the line construction, the line construction life-cycle, with the difference between the Building Information Modelling model and traditional projecting, with the participators participants of the Building Information Modelling model and which levels in the Building Information Modelling exist. In the practical part I was dealing with two levels of the Building Information Modelling designing, in which I set the total price of the building researched and then I was comparing them. In the final chapter of the thesis working expenses were set which are involved in the expenses of the total life.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:265646 |
Date | January 2017 |
Creators | Vacková, Veronika |
Contributors | Výskala, Miloslav, Aigel, Petr |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.002 seconds