This thesis deals with steady running and short-circuit conditions in the 110 kV network, E. ON, fed from 110 kV Otrokovice. Substation Otrokovice ensures system transformation from 400 kV to 110 kV system through three transformers. In order to increase reliability of power supply and improved economy is considered to bridge the transition from the operation of two transformers in bridge operations of the three transformers. However, this brings with it significant worsening of short-circuit conditions in the 110 kV network. The task of this work is to evaluate and compare the two variants of operation in terms of steady running and short-circuit conditions in the network at 110 kV and then implement operational and technical measures. The introduction describes the electricity system and its parts. The theoretical part of the paper discusses ways of dealing with steady running and short circuit conditions of long lines. Practical part will deal with applications of knowledge on the network. The conclusion summarizes the most relevant information and the results assessed both variants.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:219411 |
Date | January 2012 |
Creators | Kuba, Petr |
Contributors | Rampl, Martin, Blažek, Vladimír |
Publisher | Vysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0019 seconds