This thesis deals with load flow calculation of electrical network 110 kV before and after the connection to the 70MW gas supply and the 58MW steam and gas supply. This grid can be powered from two 400/110kV substations, namely Sokolnice and Otrokovice. The load flow calculation is realized for the power supply either from Otrokovice or Sokolnice. Furthermore, the calculation of the uni-phase and three phase short circuits in the substations of 110kV network is realized in this thesis. The result of the thesis is the assessment of the voltage ratio in the network, current load of the power line and short circuit resistance of the substations.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:220676 |
Date | January 2014 |
Creators | Macháč, Petr |
Contributors | Vaculík, Petr, Mastný, Petr |
Publisher | Vysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0024 seconds