Return to search

Modifikace utěsnění víka primárního kolektoru PG VVER 1000 / The flange gasket modification of SG VVER 1000 primary collector

This thesis deals with the replacement of the lid gasket of the primary collector of the steam generator VVER 1000. Original sealing by nickel rings is replaced by kammprofile gasket with expanded graphite layers. The thesis compare the properties of both types of gaskets and the new and the original configuration of flange joint which have been calculated according to EN 1591. The results are compared and conclusions arising therefrom are presented. The work includes results of FEM analysis of the new configuration of the flange joint. There is also a description of the main components of the nuclear power plants VVER 1000 primary circuit in the introductory part which focused on the construction and operation of the steam generator and its primary collector.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:230372
Date January 2012
CreatorsPransperger, Jan
ContributorsMartinec, Jiří, Šen, Hugo
PublisherVysoké učení technické v Brně. Fakulta strojního inženýrství
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0019 seconds