The final thesis is focused on the solution of the building technology project of storage hall in Zlín. This master’s thesis includes engineering report, studies of major technological stages, solution of transport routes, project of site equipment, design of major machines and mechanisms, technological regulations for steel hall and steel fibre reinforced concrete floor, time schedule, control and test plans for steel hall and steel fibre reinforced concrete floor, budget, time and financial plan, assembly schemes for steel hall and floor assembly.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:392243 |
Date | January 2019 |
Creators | Voráčová, Tereza |
Contributors | Liška, Pavel, Nečasová, Barbora |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.002 seconds