As part of modernization of the Brno-Přerov railway line, is in the section between village Blažovice and town Vyškov desined tunnel composed of two monorail tubes about 640 meters length. Tubes are situated in neogenic clay with an overburden height of 11 meters. This master thesis deals with design suitable tunnel exavation, primary lining with static calculation and geotechnical monitoring.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:409747 |
Date | January 2020 |
Creators | Dostál, Tomáš |
Contributors | ING, Tomáš Zítko, CEng MICE, EUR, Horák, Vladislav |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0019 seconds