Return to search

Feasibility of Diverting and Detaining Flood and Urban Storm Runoff and the Enhancement of Ground Water Recharge in the Tucson Area, Pima County, Arizona (Phase I Draft)

Phase I Draft. Prepared for United States Army Corps of Engineers, Los Angeles District, Tucson Urban Study, Regional Flood Control Element, by The University of Arizona, College of Earth Sciences, Water Resources Research Center in cooperation with College of Agriculture.

Identiferoai:union.ndltd.org:arizona.edu/oai:arizona.openrepository.com:10150/314310
Date05 1900
CreatorsWater Resources Research Center
PublisherWater Resources Research Center, University of Arizona (Tucson, AZ)
Source SetsUniversity of Arizona
Languageen_US
Detected LanguageEnglish
SourceWater Resources Research Center. The University of Arizona.

Page generated in 0.0017 seconds