Metodologias generalizadas de solução do fluxo de potência intervalar considerando dados incertos / Generalized methodologies of interval power flow solution considering data uncertainties

Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-01-07T17:13:46Z
No. of bitstreams: 1
luizeduardodesouzapereira.pdf: 1798748 bytes, checksum: 8dd5bfcce6449767d768c651966a061d (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2016-01-25T16:52:02Z (GMT) No. of bitstreams: 1
luizeduardodesouzapereira.pdf: 1798748 bytes, checksum: 8dd5bfcce6449767d768c651966a061d (MD5) / Made available in DSpace on 2016-01-25T16:52:02Z (GMT). No. of bitstreams: 1
luizeduardodesouzapereira.pdf: 1798748 bytes, checksum: 8dd5bfcce6449767d768c651966a061d (MD5)
Previous issue date: 2015-06-12 / A análise do fluxo de potência determinístico é restrita a um único instante de tempo específico. Contudo, as demandas de potência ativa e reativa, dentre outros, variam constantemente e afetam o perfil das tensões nodais e as distribuições dos fluxos de potência nos ramos do sistema elétrico. Desta forma, a utilização do modelo determinístico seria inviável, face às inúmeras simulações necessárias no sentido de representar todas as possíveis combinações das variações envolvidas no problema.
Com a utilização da matemática intervalar é possível representar intervalos de variação das demandas ativa e reativa, dos parâmetros de linha e obter, através de um fluxo de potência intervalar, o perfil das tensões nodais, as distribuições de fluxo de potência nos ramos e as perdas também na forma intervalar. Por conseguinte, é possível realizar uma análise detalhada e completa do comportamento da rede frente às variações em estudo.
A proposta do trabalho é modelar e implementar as metodologias de fluxo de potência intervalar, nas versões polar e injeção de correntes, incorporando o controle de geração de reativo em barras PV e o limite de tensão em barras PQ nos vários pontos de operação, incluindo o ponto de máximo carregamento. A simulação de Monte Carlo é utilizada como parâmetro para a aferição dos resultados. / The analysis of the deterministic power flow is restricted to a single time instant. However, the active and reactive load powers, among others, vary constantly and affect the voltage profiles and line flows throughout electric power systems. Therefore, the deterministic model is not feasible due to a number of simulations required to represent all possible combinations of the variations involved in the problem.
The interval mathematics can represent ranges of active and reactive power demand. As a result, through an interval power flow, the voltage profile at all nodes, the distribution of power flow in the branches and the losses in the interval form can also be calculated. It is therefore possible to perform a detailed analysis of the network taking into account the uncertainties under study.
The purpose of this study is to model and implement the polar and the current injection interval power flow formulations incorporating the reactive power generation control on PV buses and voltage limit control on PQ buses. Various operating points are considered, including maximum loading point. The Monte Carlo simulation is used to validate the proposed methodologies.

Identiferoai:union.ndltd.org:IBICT/oai:hermes.cpd.ufjf.br:ufjf/358
Date12 June 2015
CreatorsPereira, Luiz Eduardo de Souza
ContributorsCosta, Vander Menengoy da, Castro, Carlos Alberto de, Oliveira, Marina Lavorato de, Araujo, Débora Rosana Ribeiro Penido, Araujo, Leandro Ramos de
PublisherUniversidade Federal de Juiz de Fora, Programa de Pós-graduação em Engenharia Elétrica, UFJF, Brasil, Faculdade de Engenharia
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/doctoralThesis
Sourcereponame:Repositório Institucional da UFJF, instname:Universidade Federal de Juiz de Fora, instacron:UFJF