Return to search

Lean production management model under the change management approach to reduce order fulfillment times for Peruvian textile SMEs

Currently, small- and medium-sized enterprises face order fulfillment issues, thus generating reduced service levels. In addition, these companies are usually not aware of the importance of continuous improvement tools or of training staff as a mitigation strategy for this situation. Within this framework, the authors performed a literature review to compile production models through which downtimes could be reduced. The production model designed therefrom comprises Lean Manufacturing and work study tools within a Change Management approach. This design focuses on model implementation by small companies without requiring large investment, cutting-edge technology, or qualified personnel. Finally, an application case study was conducted in a small textile manufacturing company located at the Gamarra Fashion Center in Lima, Peru. The results that were reported revealed that late order fulfillment instances reduced by up to 18%, which had an impact on downtimes, unnecessary movements, and in-process inventory levels, thus increasing productivity by 85%.

Identiferoai:union.ndltd.org:PERUUPC/oai:repositorioacademico.upc.edu.pe:10757/656400
Date06 April 2020
CreatorsDurand-Sotelo, L., Monzon-Moreno, M., Chavez-Soriano, P., Raymundo-Ibañez, C., Dominguez, F.
PublisherInstitute of Physics Publishing
Source SetsUniversidad Peruana de Ciencias Aplicadas (UPC)
LanguageEnglish
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/article
Formatapplication/pdf
SourceUniversidad Peruana de Ciencias Aplicadas (UPC), Repositorio Académico - UPC, IOP Conference Series: Materials Science and Engineering, 796, 1
Rightsinfo:eu-repo/semantics/openAccess, Attribution-NonCommercial-ShareAlike 4.0 International, http://creativecommons.org/licenses/by-nc-sa/4.0/
Relationhttps://iopscience.iop.org/article/10.1088/1757-899X/796/1/012023

Page generated in 0.0017 seconds