A project report to the Faculty of Engineering, University of the Witwatersrand, Johannesburg, In fulfillment of the requirements for the degree of Master of Science / A detailed analysis was performed on statistics obtained from twenty two gold mines in different mining districts, to determine the parameters which affect labour productivity and working costs, (Abbreviation abstract) / AC2017
Identifer | oai:union.ndltd.org:netd.ac.za/oai:union.ndltd.org:wits/oai:wiredspace.wits.ac.za:10539/22825 |
Date | January 1994 |
Creators | Clatworthy, Geoffrey, Charles |
Source Sets | South African National ETD Portal |
Language | English |
Detected Language | English |
Type | Thesis |
Format | application/pdf |
Page generated in 0.0017 seconds